The transaction is being completed in cash. The buyer is described as a “major independent American power producer,” according to a press release from Eolus.
The project, with a total capacity of 127 MW outside Boulder City, Nevada, is under construction and is expected to be operational in 2026.
Eolus's B share is listed on the Stockholm Stock Exchange and has fallen 21.9 percent since the start of the year.





